Classroom Upgrades for Spring 2014

Renovations Completed over the December Break:

    1. Physics 1001 – Digital Upgrade, including new Technology Podium, touchpanel controls, HD Lecture Capture, Integrated Dual PCs, Dual HD Projectors, and new dimmable LED Lighting
    2. Physics 1002 – Digital Upgrade, including new Technology Podium, touchpanel controls, Integrated Dual PCs, Dual HD Projectors
    3. Leigh 207 – New carpeting
    4. CBD all 2nd floor classrooms – New paint
    5. Rolfs 115 – Walls painted
    6. Turlington L007 – New touchpanel controls, cameras and spotlighting for Enhanced Lecture Capture
    7. Turlington L011 – New touchpanel controls, cameras and spotlighting for Enhanced Lecture Capture
    8. Newins-Ziegler 222 – New whiteboards
    9. FAC 127 – New chalkboards